Which Mounting Method Fits the Job
| Job Condition | ID Mounted Choice | Split Frame Choice | Procurement Check |
|---|---|---|---|
| Pipe condition | Open end already available | Installed or continuous pipe | Confirm whether severing is required. |
| Clamping datum | Expands against pipe ID | Clamps around pipe OD | Measure the actual mounting surface. |
| Primary work | Facing and weld beveling | Cut, bevel, face or counterbore | Issue the required joint drawing. |
| Site access | Needs usable bore and end access | Needs radial and axial clearance | Submit a clearance sketch and utility data. |
Product and Series Comparison
| Product | Mounting | Working Range | Speed | Drive | Wall Capacity | Core Function |
|---|---|---|---|---|---|---|
| TIE-80 | ID mounted | 28-76 mm ID | 55 r/min | Electric, 1200 W | Up to 15 mm | Pipe-end facing and beveling |
| OCE/OCP/OCH Series | OD split frame | 25-1230 mm OD* | Model dependent | Electric / pneumatic / hydraulic | Up to 35 mm* | Cut and bevel in one setup |
The 11 kg TIE-80 uses a self-centering mandrel that expands inside the bore and squares the cutter head to the pipe axis. Its compact T-shaped body is designed for limited radial space and can produce U, single-V, double-V and J preparations. This ID mounted pipe beveling machine is the direct choice when the pipe end is open and only end preparation is required.
The OCE/OCP/OCH split frame pipe cutting and beveling machine separates into two halves for OD mounting on an existing line. It supports precision cutting, facing, counterboring and simultaneous cutting and beveling. Mechanical cold cutting avoids a thermal heat-affected zone at the machined edge. Buyers must still validate isolation, pipe support, chip control and the site work permit.
Buyer FAQs
| Procurement Question | Short Answer |
|---|---|
| Which machine suits an already-cut pipe? | Choose TIE-80 when the open-end ID is 28-76 mm and wall thickness is within 15 mm. |
| Which machine can remove a pipe section? | Choose the split-frame series when OD mounting and cutting before beveling are required. |
| What should buyers send for a quote? | Provide actual ID/OD, wall, material, joint drawing, access limits, utility and required operation. |
Post time: Oct-19-2026